山東電纜橋架的鋪設(shè)流程有哪些?

文章來源:http://m.ymmgjx.net/?? 作者:電纜橋架廠家發(fā)布時間:2021-09-06?瀏覽次數(shù):15

返回:常見問題
橋架在電力行業(yè)中占據(jù)著十分重要的地位,但如果安裝敷設(shè)不當?shù)脑挘焕诤笃谑褂玫模瑖乐剡€會出現(xiàn)坍塌等危險。那么,具體的操作流程和步驟是怎樣的呢?下面山東電纜橋架廠家就為您介紹下具體的內(nèi)容,相關(guān)人員可以參考后進行運用。
Bridge plays a very important role in the power industry, but if it is installed and laid improperly, it is not conducive to later use, and there will be serious dangers such as collapse. So, what are the specific operation processes and steps? The following Shandong cable tray manufacturer will introduce the specific contents for you, which can be used by relevant personnel after reference.
橋架由支架、支撐臂和安裝附件組成,建筑物中的橋梁可以獨立豎立,可以與各種建筑物(建筑)結(jié)構(gòu)和橋架支撐連接。
The bridge is composed of supports, support arms and installation accessories. Bridges in buildings can be erected independently and can be connected with various building (building) structures and bridge supports.
山東電纜橋架
橋架的步驟流程如下所示:
The procedure flow of the bridge is as follows:
1、應(yīng)進行電纜敷設(shè),并根據(jù)施工計劃安排電纜槽的運輸和存放。在運輸過程中,山東電纜橋架人員負責(zé)指揮。
1. Cable laying shall be carried out, and the transportation and storage of cable tray shall be arranged according to the construction plan. During transportation, Shandong cable bridge professionals are responsible for command.
2、電纜軸應(yīng)在運輸車輛上沿徑向排列,并需要以100x100的木材夾緊。在運輸車輛行走時,電纜拆卸電纜軸前后滾動。
2. The cable shafts shall be arranged radially on the transport vehicle and need to be clamped with 100x100 wood. When the transport vehicle is moving, the cable shaft shall be removed and rolled back and forth.
3、提升和裝載時,電纜軸不應(yīng)過載。為了提升木質(zhì)電纜軸,需要穿戴足夠強度的鋼管或鋼管,以便將整個軸電纜的重量加載到電纜軸上,然后將鋼管和鋼絲繩固定在兩端,距鋼管末端300mm以上的距離進行固定。
3. The cable shaft shall not be overloaded during lifting and loading. In order to lift the wooden cable shaft, it is necessary to wear steel pipe or steel pipe with sufficient strength to load the weight of the whole shaft cable onto the cable shaft, and then fix the steel pipe and steel wire rope at both ends at a distance of more than 300mm from the end of the steel pipe.
4、為便于鋪設(shè),須選擇合適的山東電纜橋架的位置,通常須靠近電纜的起點和終點。安裝時,請注意電纜軸的旋轉(zhuǎn)方向,電纜出口應(yīng)在電纜軸上方。
4. In order to facilitate laying, the appropriate location of Shandong cable tray must be selected, which must be close to the starting point and end point of the cable. During installation, please pay attention to the rotation direction of the cable shaft, and the cable outlet shall be above the cable shaft.
5、敷設(shè)電纜時,在拐角處時,施工者應(yīng)站在拐角處電纜的外側(cè),防止電纜受傷,壓迫施工者。
5. When laying the cable, the constructor shall stand outside the cable at the corner to prevent the cable from being injured and oppressing the constructor.
6、鋼絲繩軸可以通過鋼絲繩直接穿過軸。起吊前,要仔細觀察鋼結(jié)構(gòu)是否牢固焊接,提升速度應(yīng)該較慢。
6. The wire rope shaft can pass directly through the shaft through the wire rope. Before lifting, carefully observe whether the steel structure is firmly welded, and the lifting speed should be slow.
7、橋架應(yīng)根據(jù)現(xiàn)場實際情況在無橋梁、無管道鋪設(shè)路線、檢修井、隧道和電纜溝槽上適當安裝電纜橋架,加固電纜,避免電纜雜亂。
7. The cable tray shall be properly installed on the route without bridge, pipeline, manhole, tunnel and cable trench according to the actual situation of the site, and the cable shall be reinforced to avoid cable disorder.
6、施工準備完畢后,根據(jù)施工時間表,電纜電線的到來以及現(xiàn)場施工的實際情況,安排詳細的電纜和接線圖。
6. After construction preparation, detailed cable and wiring diagrams shall be arranged according to the construction schedule, the arrival of cables and wires and the actual situation of on-site construction.
安裝敷設(shè)完成后,可以對山東電纜橋架進行檢查,看是否存在不到位的地方,如果有要進行調(diào)整,一切沒有問題后再正式使用產(chǎn)品,滿足更多用戶的應(yīng)用需求。另外在后期使用中,做好對橋架的維護工作,從而讓橋架能長期使用下去,避免橋架出現(xiàn)一系列的問題。
After installation and laying, Shandong cable tray can be checked to see if there are any places that are not in place. If there is any adjustment, the product can be formally used after everything is OK to meet the application needs of more users. In addition, in the later use, do a good job in the maintenance of the bridge, so that the bridge can be used for a long time and avoid a series of problems.