濟(jì)南電纜橋架在我們的生活中已經(jīng)是很常見的設(shè)備了,當(dāng)然還是有很多問題不甚了解,需要去多多找資源,更好的使用它。那么濟(jì)南電纜橋架中的電纜需要穿管嗎?
Jinan cable bridge is already a very common equipment in our life. Of course, there are still many problems that we do not understand. We need to find more resources and make better use of it. So does the cable in Ji 'nan cable bridge need to be pierced?
電纜橋架作為布線工程的一個配套項(xiàng)目,尚無專門的規(guī)范指導(dǎo),各生產(chǎn)廠家的規(guī)格形式缺乏通用性,因此,設(shè)計選型過程應(yīng)根據(jù)電氣各個系統(tǒng)的電纜類型、數(shù)量,合理選定適用的橋架。
Cable tray as a supporting project of wiring engineering, there is no special specification guidance, the specification form of each manufacturer is lack of versatility, therefore, the design and selection process should be based on the type and quantity of electrical cables of each system, reasonable selection of suitable bridge.
濟(jì)南電纜橋架中的電纜需要穿管嗎?是需要的,穿出橋架時需要根據(jù)電纜尺寸穿稍大規(guī)格的鋼管或者撓性管。
Does the cable in Ji 'nan cable bridge need to be pierced? It is necessary to wear a slightly larger steel tube or flexible tube according to the cable size when you wear the bridge.
電纜穿管的作用:避免或減少線路途中被干擾的概率;避免線路途中對周圍電氣,電纜的干擾;其他因環(huán)境須要穿管的情況。比如較大功率變頻器的輸出電纜如果對電纜橋架中其他信號電纜產(chǎn)生的干擾無法通過其他途徑解決時,而又沒有其他的走線途徑時,可能逼迫要穿管。
Function of cable threading: avoid or reduce the probability of interference on the way; Avoid the interference of electrical and cable around the line on the way; Other circumstances requiring pipe penetration. For example, if the output cable of a high-power converter interferes with other signal cables in the cable tray, it can not be solved by other ways, and there is no other route, it may be forced to wear the pipe.

根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線和電氣管線等設(shè)置情況、方便維修,以及電纜路由的疏密來確定電纜橋架的佳路線。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如需利用綜合管廊架設(shè)時,則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線和分支線盡量避免交叉,如無其它管架借用,則需自設(shè)立(支)柱。
According to the building layout, combined with air conditioning pipeline and electrical pipeline Settings, convenient maintenance, as well as the density of cable routing to determine the best route of cable bridge. In the room, as far as possible along the walls of the building, column, beam and floor erection, such as the need to use the comprehensive pipe gallery erection, should be set up in parallel on the side or above the pipeline, and consider the lead line and branch line as far as possible to avoid crossing, if there is no other pipe frame borrowed, it is necessary to set up (support) column.
在工程設(shè)計中,
濟(jì)南電纜橋架的布置應(yīng)根據(jù)經(jīng)濟(jì)合理性、技術(shù)可行性、運(yùn)行性等因素綜合比較,以確定方案,還要充分滿足施工安裝、維護(hù)檢修及電纜敷設(shè)的要求。橋架水平敷設(shè)時距地面的高度一般不低于于2.5m,垂直敷設(shè)時距地面1.8m以下部分應(yīng)加金屬蓋板保護(hù),但敷設(shè)在電氣專用房間內(nèi)時除外。電纜橋架水平敷設(shè)在設(shè)備夾層或馬道且低于2.5m,應(yīng)采取保護(hù)接地措施。
In the engineering design, the layout of the bridge should be based on the comprehensive comparison of economic rationality, technical feasibility, operation safety and other factors to determine the scheme, but also fully meet the requirements of construction, installation, maintenance and cable laying. When the bridge is laid horizontally, the height from the ground is generally not less than 2.5m. When the bridge is laid vertically, the part below 1.8m from the ground should be protected by metal cover plates, except when laid in the electrical special room. If the cable tray is horizontally laid in the equipment interlayer or the horse path and lower than 2.5m, protective grounding measures should be taken.
濟(jì)南電纜橋架中的電纜需要穿管嗎?實(shí)際上,這個需要按現(xiàn)場情況和鋪設(shè)線纜的用途而定,并不能一概而論。更多內(nèi)容就來我們網(wǎng)站
m.ymmgjx.net咨詢吧!
Does the cable in Ji 'nan cable bridge need to be pierced? In fact, this depends on the site situation and the purpose of laying cables, and cannot be generalized. Come to our website for more information!