說(shuō)到弱電橋架,可能大家比較陌生,它是用來(lái)保護(hù)電線、電纜的一種設(shè)備。那么,弱電橋架需要跨接線嗎?一起來(lái)看看。
When it comes to weak current bridge, you may be unfamiliar with it. It is a kind of equipment used to protect wires and cables. Then, does the weak current bridge need jumper wire? Let's have a look.
需要,弱電橋架的中間需要安裝一個(gè)隔離板,才能方便把網(wǎng)絡(luò)、電視、弱電等線路進(jìn)行隔離開,否則這些線路會(huì)相互干擾,影響電路使用。在安裝弱電橋架時(shí),要找好位置,進(jìn)行定位彈線。之后再安裝支架,要保證支架水平,調(diào)整好位置,然后再固定好橋架。
It is necessary to install an isolation board in the middle of the weak current bridge to facilitate the isolation of network, TV, weak current and other lines, otherwise these lines will interfere with each other and affect the use of the circuit. When installing the weak current bridge, first find the position and snap the line. After that, install the support, ensure the support is horizontal, adjust the position, and then fix the bridge.
安裝濟(jì)南橋架時(shí),要求電氣豎井內(nèi)的橋架規(guī)格要符合要求,一定要采用防火制品。當(dāng)橋架的寬度小于400毫米時(shí),厚度不小于1.5毫米,當(dāng)寬度在400-800毫米時(shí),厚度不能小于2毫米。
When installing Jinan Bridge, it is required that the specifications of the bridge in the electrical shaft should meet the requirements, and fire-proof products must be used. When the width of the bridge is less than 400mm, the thickness shall not be less than 1.5mm; when the width is 400-800mm, the thickness shall not be less than 2mm.
安裝弱電橋架時(shí),應(yīng)保證表面平直,不能出現(xiàn)扭曲問(wèn)題,支架要焊接牢固,下料誤差不能超過(guò)5毫米,而且切口處不能出現(xiàn)卷邊毛刺。
When installing the weak current cable tray, the surface shall be straight without distortion. The support shall be welded firmly. The blanking error shall not exceed 5mm, and there shall be no curling burr at the notch.

在豎井內(nèi)的配電箱要有質(zhì)量保證,要有出廠合格證、3C認(rèn)證標(biāo)志等,才能證明配電箱質(zhì)量可靠。
The distribution box in the shaft shall have quality assurance, factory certificate, 3C certification mark, etc. to prove the reliable quality of the distribution box.
安裝的電線、電纜和一些附件要采用符合標(biāo)準(zhǔn)的產(chǎn)品,要有產(chǎn)品合格證,否則產(chǎn)品質(zhì)量沒(méi)有保證的話,也會(huì)影響弱電橋架安裝。
The installed wires, cables and some accessories shall be products that meet national standards and have product certificates, otherwise the installation of weak current bridge will be affected if the product quality is not guaranteed.
安裝
濟(jì)南橋架時(shí),要選擇合適的位置,要把它敷設(shè)在、干燥、容易操作的豎井內(nèi)。而且要先設(shè)計(jì)好施工圖紙,按照設(shè)計(jì)好的位置安裝,以免影響施工。當(dāng)豎井內(nèi)橋架和配電箱較多,尺寸較大時(shí),容易出現(xiàn)排列困難問(wèn)題,所以安裝時(shí)要看清楚尺寸。
When installing Jinan Bridge, it is necessary to select a suitable position and lay it in a safe, dry and easy to operate shaft. In addition, the construction drawings shall be designed first and installed according to the designed position to avoid affecting the construction. When there are many bridges and distribution boxes in the shaft and the size is large, the arrangement is easy to be difficult, so the size should be clearly seen during installation.
以上是關(guān)于弱電橋架需要跨接線嗎的相關(guān)內(nèi)容,相信大家都明白了吧!弱電橋架安裝時(shí)需要注意很多內(nèi)容,大家不妨可以參考以上的信息。關(guān)注我們
m.ymmgjx.net,了解更多!
The above is about whether the weak current bridge needs jumper wire. I believe everyone understands it! There are many things to pay attention to during the installation of weak current cable tray. You may wish to refer to the above information. Follow us at www.sddlqj Cn, learn more!