在電網應用中,電纜橋架發揮了什么作用與優勢?電纜橋架也分為槽式,梯級式等,下面來講講
山東橋架的制造與安裝留意事項。
What role and advantages does cable tray play in power grid application? The cable tray is also divided into trough type, ladder type, etc. Next, we will talk about the manufacturing and installation precautions of Shandong cable tray.
強、弱電線路應分槽敷設,強、弱電線路不得與線槽直接接觸,強、弱電線路在分線盒(箱)交叉時須用金屬隔板隔開。各種配線在地線槽內的只允許出口與分線盒連接。在施工和安裝地溝管時,要求將所有地溝管連成一個可靠的整體。
Strong and weak current lines shall be laid in separate slots. Strong and weak current lines shall not directly contact the trunking. Strong and weak current lines must be separated by metal partitions when crossing junction boxes (boxes). The outlet of various wiring in the ground wire slot is only allowed to be connected with the junction box. During construction and installation of trench pipes, it is required to connect all trench pipes into a reliable whole.
采用彈線法確定橋架的安裝位置,并對其進行定位,作好標記。豎井內橋架的安裝基準線應先用懸吊法確定,隨時觀察預留孔,若不合適。應及時調整,并進行修補。
The installation position of the bridge shall be determined by snapping the line, and it shall be positioned and marked. The installation datum line of the cable tray in the shaft shall be determined by suspension method first, and the reserved holes shall be observed at any time, if not appropriate. It shall be adjusted and repaired in time.

按照施工圖的橋架規范和設計標高對橋架進行定位,然后制作支架需要根據測量尺寸,支架按工廠化生產。無頂棚的吊頂,沿梁底吊裝或靠墻支撐,有頂棚的,吊裝或靠墻支撐。
The bridge shall be positioned according to the bridge specification and design elevation in the construction drawing, and then the support shall be manufactured according to the measured size and factory production. The suspended ceiling without ceiling shall be hoisted along the beam bottom or supported against the wall, and the suspended ceiling with ceiling shall be hoisted or supported against the wall.
考慮到建筑美觀和便于維護,不掛頂的公共空間組合結構構件,可采用靠墻安裝,屋內下弦支撐安裝或柱子支撐安裝。靠墻的支座采用膨脹螺栓固定,支座間間隔不超過2米。
Considering the beauty of the building and the convenience of maintenance, the composite structural members of the public space without ceiling can be installed against the wall, supported by the lower chord of the house or supported by the column. The supports against the wall shall be fixed with expansion bolts, and the spacing between supports shall not exceed 2m.
對于橫跨建筑物變形縫、彎曲半徑大于300mm的橫截面積較大的橫截面積段,應加裝吊具,吊具安裝時應保證橋架水平或垂直度符合要求。
For the section with large cross sectional area crossing the deformation joint of the building and the bending radius greater than 300 mm, slings shall be installed. During the installation of slings, the levelness or perpendicularity of the bridge shall meet the requirements.
橋架的接地處理,可采用連接板作為跨接線,將其連在一起。在連接板的兩端安裝鍍鋅彈簧墊圈,用不少于4mm2的軟銅線跨越橋架,再將橋架與地線連接,形成電氣通道。橋梁架體和地線主干至少應有兩處連接。
For the grounding of the cable tray, the connecting plate can be used as the jumper to connect them together. Galvanized spring washers shall be installed at both ends of the connecting plate. Soft copper wires of not less than 4mm2 shall be used to cross the bridge, and then the bridge shall be connected with the ground wire to form an electrical channel. There shall be at least two connections between the bridge frame and the main grounding wire.
So far are the manufacturing and installation precautions of cable tray. You should pay attention to its cleaning and regular maintenance. More relevant matters can be found on our website http://m.ymmgjx.net Consult!