橋架在現(xiàn)場(chǎng)施工有幾點(diǎn)需求要特別注意!

文章來(lái)源:http://m.ymmgjx.net/?? 作者:電纜橋架廠家發(fā)布時(shí)間:2023-01-31?瀏覽次數(shù):8

返回:公司新聞
橋架是電力體系首要的承載設(shè)備,橋架的施工會(huì)影響今后線路的鋪設(shè)保護(hù),橋架在現(xiàn)場(chǎng)施工首要有以下幾點(diǎn)需求注意,山東電纜橋架廠家為您解答:
The bridge is the primary bearing equipment of the power system. The construction of the bridge will affect the laying and protection of the line in the future. The bridge construction on the site should pay attention to the following points. Shandong cable bridge manufacturer will answer for you:
1、聯(lián)系圖紙,并排橋架選用一根橫擔(dān),并排敷設(shè);
1. According to the drawing, one cross arm shall be selected for the side-by-side bridge and laid side by side;
2、橋架每?jī)奢S在梁上裝置固定支架,支架標(biāo)準(zhǔn)依據(jù)橋架橫擔(dān)標(biāo)準(zhǔn)定;
2. Fixed support is installed on the beam every two axes of the bridge, and the support standard is determined according to the cross arm standard of the bridge;
3、橋架支架有要固定、且保證橋架橫擔(dān)水平及直線度;
3. The bridge support shall be fixed and ensure the levelness and straightness of the bridge cross arm;
4、穿越風(fēng)管及管道等上、下返彎的便宜彎頭曲折視點(diǎn)有要擴(kuò)大,(內(nèi)角大于45°角),且保證便宜彎頭接口密封;
4. The zigzag view point of the cheap elbow crossing the upper and lower bends of the air duct and pipeline shall be expanded (the internal angle is greater than 45 °), and the sealing of the cheap elbow interface shall be ensured;
5、任何班組不得私自改變橋架標(biāo)準(zhǔn)及走向,有要經(jīng)甲方及監(jiān)理書(shū)面贊同后方可施工;且各班組施工節(jié)點(diǎn)部位不得隨意,嚴(yán)厲按圖紙及項(xiàng)目部需求施工;
5. Any team shall not change the bridge standard and direction without permission. Construction can only be carried out with the written approval of Party A and the supervisor; In addition, the construction nodes of each team shall not be arbitrarily constructed in strict accordance with the drawings and the requirements of the Project Department;
6、各班組施工前有要按項(xiàng)目部統(tǒng)一安排,不得到處胡亂施工,按區(qū)按體系完結(jié),;
6. Before construction, each team shall make unified arrangement according to the project department. It is not allowed to carry out random construction everywhere, and it shall be completed according to the system according to the area,;
山東電纜橋架廠家
7、橋架支架距離不得大于兩米;且支架吊筋穿越橫擔(dān)部位不得善于5CM;
7. The distance between bridge supports shall not be more than two meters; Moreover, the position where the suspension bar of the support crosses the cross arm shall not be better than 5cm;
8、橋架爬彎300MM部位宜設(shè)支架;
8. Support should be set at 300MM position of the bridge climbing bend;
9、每節(jié)橋架連接線不得遺失;
9. Each bridge connecting line shall not be lost;
10、各橋架配件運(yùn)用準(zhǔn)則按圖紙,如現(xiàn)場(chǎng)部位無(wú)法施工,需經(jīng)項(xiàng)目部現(xiàn)場(chǎng)決議,不得私自施工;
10. The application criteria of all bridge accessories shall be in accordance with the drawings. If the site parts cannot be constructed, the on-site resolution of the Project Department is required, and the construction without permission is not allowed;
施工裝置依照?qǐng)D紙進(jìn)行,每一個(gè)環(huán)節(jié)都要用心,才干定心。以上是電纜橋架廠家講解的小知識(shí),歡迎大家多多關(guān)注我們的網(wǎng)站http://m.ymmgjx.net
The construction equipment shall be carried out according to the drawings, and every link shall be attentive and capable. The above is a little knowledge explained by the cable bridge manufacturer. Welcome to pay more attention to our website http://m.ymmgjx.net !