梯級(jí)式橋架安裝指南及操作說(shuō)明

文章來(lái)源:http://m.ymmgjx.net/?? 作者:電纜橋架廠家發(fā)布時(shí)間:2023-02-24?瀏覽次數(shù):11

返回:公司新聞
橋架又叫做電纜橋架,是建筑電氣工程中用于線纜的敷設(shè),主要作用是保護(hù)、管理、支撐線纜或光纖。那么梯級(jí)式橋架安裝是怎樣的呢?下面濟(jì)南電纜橋架廠家為您解答。
Cable tray, also called cable tray, is used for cable laying in building electrical engineering. Its main function is to protect, manage and support cables or optical fibers. So what is the installation of step bridge? Next, Jinan cable bridge manufacturer will answer for you.
1)電纜橋架及線槽敷設(shè)走向應(yīng)短捷,并應(yīng)盡量沿墻、沿柱或沿梁敷設(shè)。
1) The cable tray and trunking shall be laid along the wall, column or beam as soon as possible.
2)依據(jù)電纜橋架及線槽敷設(shè)走向,向土建、結(jié)構(gòu)提出預(yù)留墻洞、樓板洞及吊架裝置時(shí),所需預(yù)埋鋼板方位及荷載。而且應(yīng)與工藝、水暖及動(dòng)力相和諧。
2) According to the laying trend of cable tray and trunking, the orientation and load of the embedded steel plate required for the reserved wall hole, floor hole and hanger device are proposed to the civil engineering and structural disciplines. It should also be in harmony with technology, plumbing and power.
3)地上內(nèi)暗裝金屬線槽布線,在設(shè)計(jì)時(shí)應(yīng)與土建密切配合,以便依據(jù)不同的結(jié)構(gòu)型式和修建布局,合理斷定線路途徑和設(shè)備選型。
3) The concealed metal trunking wiring on the ground shall be designed in close cooperation with the civil engineering discipline, so as to reasonably determine the route and equipment selection according to different structural types and construction layout.
4)不同電壓、不同用處的電纜不宜敷設(shè)在同一層電纜橋架內(nèi):
4) Cables with different voltages and different uses should not be laid in the same layer of cable tray:
1kV以上和1kV及以下的電纜;
Cables above 1kV and below 1kV;
同一途徑向一級(jí)負(fù)荷供電的雙回路電纜;
Double-circuit cables supplying power to primary load in the same way;
應(yīng)急照明和其他照明的電纜;
Cables for emergency lighting and other lighting;
電力、操控和電信電纜。若不同等級(jí)的電纜敷設(shè)在同一電纜橋架時(shí),中心應(yīng)添加隔板阻隔。
Power, control and telecommunication cables. If cables of different grades are laid on the same cable tray, a partition shall be added in the center to block them.
5)在工程條件下裝置或檢修不需考慮附加會(huì)集荷載時(shí),電纜梯架、托盤(pán)的作業(yè)均布荷載按電纜自重均勻分布核算。
5) When additional concentrated load is not required for installation or maintenance under engineering conditions, the operation uniform load of cable ladder and tray shall be calculated according to the uniform distribution of cable dead weight.
6)電纜橋架不宜與下列管道平行敷設(shè),當(dāng)無(wú)法防止時(shí),電纜橋架的方位應(yīng)契合下列規(guī)則,或采納相應(yīng)防護(hù)辦法。
6) The cable tray should not be laid in parallel with the following pipes. When it cannot be prevented, the orientation of the cable tray should conform to the following rules or adopt corresponding protective measures.
濟(jì)南電纜橋架廠家
電纜橋架應(yīng)在具有腐蝕性液體管道上方。
The cable tray shall be above the pipeline with corrosive liquid.
電纜橋架應(yīng)在熱力管道下方。
The cable tray shall be under the heating pipe.
易燃易爆氣體比空氣重時(shí),電纜橋架應(yīng)在管道上方。
When flammable and explosive gases are heavier than air, the cable tray shall be above the pipe.
易燃易爆氣體比空氣輕時(shí),電纜橋架應(yīng)在管道下方。
When the flammable and explosive gas is lighter than air, the cable bridge shall be under the pipe.
7)電纜橋架與管道之間小間隔見(jiàn)相關(guān)標(biāo)準(zhǔn)。
7) See relevant standards for small spacing between cable tray and pipeline.
8)歸納布線電纜與鄰近可能發(fā)生高電平電磁攪擾的電動(dòng)機(jī)、電力變壓器等電氣設(shè)備之間應(yīng)堅(jiān)持必要的距離。歸納布線電纜與電力電纜的距離應(yīng)契合GB/T50311-2000標(biāo)準(zhǔn)11.0.2條的規(guī)則。
8) Necessary distance shall be maintained between inductive wiring cables and electrical equipment such as motors, power transformers, etc. that may cause high level electromagnetic disturbance. The distance between inductive wiring cable and power cable shall conform to the rules of Article 11.0.2 of GB/T50311-2000 standard.
9)墻上敷設(shè)的歸納布線電纜、光纜及管線與其它管線的距離應(yīng)契合GB/T50311-2000標(biāo)準(zhǔn)11.0.2條的規(guī)則。
9) The distance between inductive cabling cables, optical cables and pipelines laid on the wall and other pipelines shall conform to the rules of Article 11.0.2 of GB/T50311-2000 standard.
10)電纜橋架水平敷設(shè)時(shí),宜按荷載曲線選取佳跨距進(jìn)行支撐,跨距一般為1.5~3.0m。筆直敷設(shè)時(shí),其固定距離不宜大于2m。
10) When the cable tray is laid horizontally, the best span should be selected according to the load curve for support, and the span is generally 1.5~3.0m. When laying straight, the fixed distance should not be more than 2m.
梯級(jí)式橋架安裝指南及操作說(shuō)明相關(guān)內(nèi)容如上,您對(duì)此有什么疑惑或者需求就來(lái)我們網(wǎng)站http://m.ymmgjx.net咨詢!
The relevant contents of the installation guide and operation instructions of the stepped bridge are as above. If you have any doubts or needs, please come to our website http://m.ymmgjx.net consulting service