濟(jì)南電纜橋架作為布線工程的一個(gè)配套項(xiàng)目,現(xiàn)在尚無專門的標(biāo)準(zhǔn)輔導(dǎo),一個(gè)生產(chǎn)廠家的標(biāo)準(zhǔn)程式缺少通用性,因而,設(shè)計(jì)選型進(jìn)程應(yīng)依據(jù)弱電各個(gè)系統(tǒng)纜顯得類型、數(shù)量,合理選定適用的橋架。
Jinan cable bridge as a supporting project of wiring engineering, there is no special standard guidance, a manufacturer's standard program is lack of universality, therefore, the design and selection process should be based on the type and quantity of each weak current system cable, reasonable selection of suitable bridge.
斷定方向: 依據(jù)修建平面布置圖,結(jié)合空調(diào)管線和電氣管線等設(shè)置狀況、便利修理,以及電纜路由的疏密來斷定電纜橋架的路由。在室內(nèi),盡可能沿修建物的墻、柱、梁及樓板架起,多么使用歸納管廊架起時(shí),則應(yīng)在管道一側(cè)或上方平行架起,并考慮引下線和分支線盡量防止穿插,如無其它管架借用,則需自建立(支)柱。
Determine the direction: determine the route of cable bridge according to the construction layout plan, the setting condition of air conditioning pipeline and electrical pipeline, the convenience of repair, and the density of cable route. Indoors, it should be erected along the wall, column, beam and floor of the building as far as possible. When the pipe gallery is used, it should be erected parallel on one side or above the pipe, and the down lead and branch line should be considered to avoid interpenetration as far as possible. If there is no other pipe rack to borrow, it is necessary to establish (support) column by itself.

荷載核算:核算電纜橋架主干線縱斷面上單位長度的電纜分量。斷定橋架的寬度:依據(jù)布放電纜條數(shù)、電纜直徑及電纜的距離來斷定電纜橋架的類型、標(biāo)準(zhǔn), 托臂的長度,支柱的長度、距離,橋架的寬度和層數(shù)。
Load Accounting: calculate the cable component per unit length on the vertical section of the main line of cable bridge. Determine the width of the cable tray: determine the type and standard of the cable tray, the length of the bracket, the length and distance of the pillar, the width and number of layers of the cable tray according to the number of cables, the diameter of the cable and the distance of the cable.
安裝方法:依據(jù)場所的設(shè)置條件斷定橋架的固定方法,挑選懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供給的,此外,依據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板繪出電纜橋架平、剖面圖,部分部位還應(yīng)繪出空間圖,開列材料表。如與電力電纜橋架合用時(shí),應(yīng)將電力電纜和弱電電纜各直一側(cè),中心選用隔板分隔。
Installation method: determine the fixing method of the cable tray according to the setting conditions of the site, and select the suspension type, vertical type, side wall type or mixed type. The connectors and fasteners are generally supplied together. In addition, according to the bridge structure, select and fold the corresponding cover plate, draw the plane and section drawings of the cable tray, and draw the space diagram for some parts, and list the material list. If it is used together with power cable bridge, the power cable and weak current cable should be separated on each straight side, and the center should be separated by partition.