電纜橋架布線和金屬線槽布線有何不同?

文章來(lái)源:http://m.ymmgjx.net/?? 作者:電纜橋架廠家發(fā)布時(shí)間:2023-03-07?瀏覽次數(shù):13

電纜橋架的安裝布線可以沿頂板安裝、沿墻水平和垂直安裝、沿豎井安裝,也可以沿地面、電纜溝及管道支架安裝。我們?cè)撊绾芜x擇布線方式,金屬線槽布線和電纜橋架布線又有什么不同?下面濟(jì)南電纜橋架廠家為您分析:
The cable tray can be installed along the roof, horizontally and vertically along the wall, along the shaft, and along the ground, cable trench and pipe support. How do we choose the wiring method? What is the difference between metal trunking wiring and cable tray wiring? Jinan cable bridge manufacturer will analyze for you:
金屬線槽布線
Metal trunking wiring
(1)金屬線槽布線搬適用于正常環(huán)境的室內(nèi)干燥和不易受機(jī)械損傷的場(chǎng)所明敷,但對(duì)金屬線槽有嚴(yán)重腐蝕的場(chǎng)所不應(yīng)采用。
(1) The metal trunking wiring is suitable for outdoor laying in dry indoor places and places not vulnerable to mechanical damage in normal environment, but it should not be used in places with serious corrosion to the metal trunking.
(2)同一回路的所有相線和中性線,應(yīng)敷設(shè)在同一金屬線槽內(nèi)。同一路徑無(wú)防干擾要求的線路,可敷設(shè)于同一金屬線槽內(nèi),線槽內(nèi)電線或電纜的總截面(包括外護(hù)層)不應(yīng)超過(guò)線槽內(nèi)截面的20%,載流導(dǎo)線不宜超過(guò)30根。控制、信號(hào)或與其相類似的線路,電線或電纜的總截向下應(yīng)超過(guò)線槽內(nèi)截面的50%,電線或電纜根數(shù)下限。
(2) All phase and neutral wires of the same circuit shall be laid in the same metal trunking. Lines with no anti-interference requirements in the same path can be laid in the same metal trunking. The total cross-section of wires or cables in the trunking (including the outer protective layer) should not exceed 20% of the cross-section in the trunking, and the number of current-carrying conductors should not exceed 30. For control, signal or similar lines, the total cross section of wires or cables shall exceed 50% of the cross section in the trunking, and the lower limit of the number of wires or cables.
(3)金屬線槽垂直或傾斜安裝時(shí),應(yīng)采取措施防止電線或電纜在線槽內(nèi)移動(dòng)。
(3) When the metal trunking is installed vertically or obliquely, measures shall be taken to prevent wires or cables from moving in the trunking.
(4)由金屬線槽引出的線路,可采用金屬管,硬質(zhì)塑料管、半硬塑料管、金屬軟管或電纜等布線方式。電線或電纜在引出部分不得遭受損傷。
(4) The lines led from the metal trunking can be routed by metal pipes, rigid plastic pipes, semi-rigid plastic pipes, metal hoses or cables. The wire or cable shall not be damaged at the outgoing part.
(5)線糟應(yīng)平整、無(wú)扭曲變形,內(nèi)壁應(yīng)光滑、無(wú)毛刺。
(5) The wiring duct shall be flat without distortion and deformation, and the inner wall shall be smooth without burr.
(6)金屬線槽應(yīng)可靠接地或接零,但不應(yīng)作為設(shè)備的接地導(dǎo)體。
(6) Metal trunking shall be reliably grounded or connected to neutral, but shall not be used as the grounding conductor of equipment.
濟(jì)南電纜橋架
電纜橋架布線
Cable tray routing
(1)在室內(nèi)采用電纜橋架布線時(shí),其電纜不應(yīng)有黃麻或其他易延燃材料外護(hù)層。
(1) When the cable tray is used for indoor wiring, the cable shall not have jute or other combustible materials.
(2)在有腐蝕或非常濕潤(rùn)的場(chǎng)所采用電纜橋架布線時(shí),應(yīng)根據(jù)腐蝕介質(zhì)的不同采取相應(yīng)的防護(hù)措施,并宜選用塑料護(hù)套電纜。
(2) When cable tray is used for wiring in corrosive or especially wet places, corresponding protective measures shall be taken according to different corrosive media, and plastic sheathed cables shall be selected.
(3)電纜橋架(托盤)水平安裝時(shí)的距地高度一般不宜低于2.50m,垂直安裝時(shí)距地1.80m以下部分應(yīng)加金屬蓋板保護(hù),但敷設(shè)在電氣專用房間(如配電室,電氣豎井、技術(shù)層等)內(nèi)時(shí)除外。
(3) The height of cable tray (tray) from the ground should not be less than 2.50m when installed horizontally, and the part below 1.80m from the ground should be protected by metal cover plate when installed vertically, except when it is laid in special electrical rooms (such as distribution room, electrical shaft, technical floor, etc.).
(4)電纜橋架水平安裝時(shí),宜按荷載曲線選取佳跨距進(jìn)行支撐,跨距一般為1.5~3m。垂直敷設(shè)時(shí),其固定點(diǎn)間距不宜大于2m。
(4) When the cable tray is installed horizontally, the best span should be selected according to the load curve for support, and the span is generally 1.5~3m. When laying vertically, the spacing between fixed points should not be greater than 2m.
(5)幾組電纜橋架在同一高度平行安裝時(shí),各相鄰電纜橋架間應(yīng)考慮維護(hù)、檢驗(yàn)間隔。
(5) When several groups of cable trays are installed in parallel at the same height, the maintenance and inspection interval between adjacent cable trays shall be considered.
(6)在電纜橋架上可以無(wú)間距敷設(shè)電纜,電纜在橋架內(nèi)橫斷面的填充率:電力電纜不應(yīng)大于40%;控制電纜不應(yīng)大于50%。
(6) The cable can be laid on the cable tray without spacing, and the filling rate of the cross section of the cable in the tray: the power cable should not be greater than 40%; The control cable shall not be more than 50%.
(7)下列不同電壓,不同用途的電纜,不宜敷設(shè)在同一層橋架上:
(7) The following cables with different voltages and different purposes should not be laid on the same bridge:
lkV以上和1kV以下的電纜。
Cables above 1kV and below 1kV.
同一路徑向一級(jí)負(fù)荷供電的雙路電源電纜。
Two-way power cable supplying power to primary load in the same path.
應(yīng)急照明和其他照明的電纜。
Cables for emergency lighting and other lighting.
強(qiáng)電和弱電電纜。
Strong and weak current cables.
電纜橋架布線和金屬線槽布線有何不同?以上就是該問(wèn)題的解答了,您對(duì)此有怎樣的疑惑或者需求,就來(lái)我們網(wǎng)站http://m.ymmgjx.net咨詢了解吧!
What is the difference between cable tray wiring and metal trunking wiring? The above is the answer to this question. If you have any doubts or needs about it, please come to our website http://m.ymmgjx.net Ask about it!
工程案例 / Case Show
  • 濟(jì)南火車站 濟(jì)南火車站
  • 曲阜孔子文化會(huì)展中心 曲阜孔子文化會(huì)展中心
  • 山東工藝美院 山東工藝美院
  • 公安廳服務(wù)展示 公安廳服務(wù)展示
推薦資訊 / Recommended news
  • 梯式橋架:工業(yè)動(dòng)力的“呼吸”骨架梯式橋架:工業(yè)動(dòng)力的“呼吸”骨架

    在建筑電氣與工業(yè)廠房的龐大系統(tǒng)中,電纜橋架猶如人體的血管,負(fù)責(zé)輸送持續(xù)供應(yīng)的動(dòng)力與信號(hào)。而在眾多橋架類型中,梯式橋架憑借其獨(dú)特的結(jié)構(gòu)設(shè)計(jì),成為了大截面動(dòng)力電纜的絕佳載體。In the vast sys

    TIME:2026-06-22