1.電纜橋架設(shè)備平衡氣缸動(dòng)作狀況及其機(jī)油潤滑系統(tǒng)油路,接頭等測試檢查.
1. Test and check the operation condition of balance cylinder of cable bridge equipment and the oil circuit and joint of oil lubrication system
2.電纜橋架設(shè)備滑塊與導(dǎo)軌之間的摩擦較為頻繁,應(yīng)做必要的調(diào)整較正,檢查接頭部位的潤滑優(yōu)良及管路等,保證良好的運(yùn)轉(zhuǎn)。
2. The friction between sliding block and guide rail of cable bridge equipment is frequent, so necessary adjustment should be made, and the lubrication of joint and pipeline should be checked to ensure good operation.
3.定期為電纜橋架設(shè)備齒輪部位潤滑:齒輪傳動(dòng)箱及內(nèi)部機(jī)件因?yàn)榻?jīng)常運(yùn)轉(zhuǎn)損壞的可能性比較大,出現(xiàn)松動(dòng)的可能性更大。當(dāng)這些部位出現(xiàn)噪音后,可先對(duì)此進(jìn)行潤滑,然后根據(jù)振動(dòng)情況,檢查系統(tǒng)之間的的注油點(diǎn)的吐油量和壓力測試,進(jìn)行適當(dāng)?shù)恼{(diào)整。
3. Regularly lubricate the gear parts of cable bridge equipment: the gear box and internal parts are more likely to be damaged due to frequent operation, and more likely to be loose. When there is noise in these parts, it can be lubricated first, and then according to the vibration situation, check the oil discharge amount and pressure test of the oil filling points between the systems, and make appropriate adjustment.

4.動(dòng)荷載是指電纜電纜橋架安裝和維護(hù)過程中,施工維修人員的重量。對(duì)于輕型電纜電纜橋架,一般不考慮動(dòng)荷載,即不允許在電纜橋架上站人,如果需要考慮站人,則應(yīng)將跨距適當(dāng)縮小。
4. Dynamic load refers to the weight of construction and maintenance personnel in the process of cable bridge installation and maintenance. For the light cable bridge, the dynamic load is generally not considered, that is, people are not allowed to stand on the cable bridge. If people need to be considered, the span should be appropriately reduced.
5.靜荷載是指敷設(shè)在電纜電纜橋架內(nèi)的電纜種類、根數(shù)、每根的外徑重量/單位長度,按電纜敷設(shè)的不同路由分別列表統(tǒng)計(jì)。
5. Static load refers to the type, number, outer diameter weight / unit length of each cable laid in the cable tray, which is listed and counted according to different routes of cable laying.
6.附加荷載僅在室外是指冰雪、風(fēng)和電磁力所形成的荷載,它與安裝場所的地區(qū)自然氣象條件和帶電體的性質(zhì)有關(guān),設(shè)計(jì)中應(yīng)根據(jù)各種條件加以計(jì)算。
6. The additional load only refers to the load formed by ice, snow, wind and electromagnetic force outdoors, which is related to the natural meteorological conditions of the installation site and the nature of the charged body, and should be calculated according to various conditions in the design.